§01 / 01Tag · operations
#operations
2 entries
§ 001§ 002
Attendance vs timesheets: which one do you actually need?
Two overlapping-but-distinct systems for capturing time worked. A decision framework, and why most Indian AEC practices need both — not one or the other.
05 Apr 2026
3 min read
Resource utilisation KPIs for Indian AEC firms
The four utilisation metrics that actually matter for an architecture practice or consulting firm — how to compute them, and what thresholds to flag.
02 Apr 2026
2 min read